Friday, June 25, 2021

Falmouth ARA Field Day 21 Setup

 The FD setup crew, consisting of 14 of the usual suspects, met at the FARA storage container at 10 am.  There were trucks, SUV's and vans, so more than enough room for the equipment

The equipment was transported to the Morse Pond School, this year's FD site.  The site is ideal, since it is close to town, has a permanent "tent", and plenty of room for antennas.

Ralph brought in the new FARA Communications trailer.  Ralph, N1YHS, did a fabulous job on the trailer.  It has three great operating positions, lots of VHF/UHF radios and antennas, battery power, and numerous well thought-out features to support a variety of operations.

The tower and antenna setup went smoothly.  All that is left is to power up with the generator on Saturday morning and check out the station operation.  Many thanks to the setup crew for a job well done.

A few photos: